April 26, 2017 Opera House Update

    Work continues, in earnest, on the Havre de Grace Opera House, a community cultural arts center. During the next few weeks, construction crews will complete steel erection, framing, electrical and plumbing rough-in on the addition as well as the roof will be constructed, concrete floors will be poured, and the elevator will begin to be installed.
    On the original building, the insulation, tin ceiling drywall and insulation will be completed as well as the installation of the pipe grids over the main stage and black box theater.
    Theater seating, lighting, tile floor coverings and painting will be installed in the existing building during the last of May. The elevator and floor and wall finishes will be completed in the atrium also during that time period.
    The grand opening being planned by the Havre de Grace Arts Collective is scheduled for June 24th.